Applicant: Design studio AR NUVO.
Implementation period: 2 months
Project objective: To renovate dormitory block No.12, including the installation of showers and bathroom facilities for boys and girls and terrace extension.
To re-plan dormitory block No.12 with the installation of 2 bathrooms with shower cabins. The design of bathrooms and shower cabins envisages moisture resistant gypsum cardboard on a metal framework, and ceramic tile for facing.
To extend two wooden terraces.
Water sewage will be connected to the existing sanitary system of the camp. Water will be heated by a domestic water heater.
Total project funding (USD): 28,106
Source of financing:
Project site: Sozhsky Bereg children’s camp, urochishe Chenki, Gomel District.
Contact person:
Igor Beizerov,
Head of the education, sport, and tourism department of the Gomel District Executive Committee
Phone: (0232) 53 78 35
Applicant: Department of Education, Sports and Tourism of the Gomel District Executive Committee
Implementation period: 2 months
Project objective: To improve the camp infrastructure
Goals: To provide complete overhaul including the installation of modern covering.
To replace track covering
To repair jumping pits, basketball, volleyball and handball courts.
Total project funding (USD): 37,200
Source of financing:
Project site: Skazochnaya Polyana recreation camp, urochishe Teryuha, Gomel District, Gomel Oblast
Contact person:
Igor Beizerov,
Head of the education, sport, and tourism department of the Gomel District Executive Committee
Phone: (0232) 53 78 35
Applicant: Department of Education, Sports and Tourism of the Gomel District Executive Committee
Implementation period: 4 months
Project objective: to reduce energy costs, increase the use of renewable energy, reduce technological environmental impact.
Goals: To increase the use of own energy resources and develop new ones.
To install a solar water heating system
To connect an electric water heating system in the laundry room to the electric network
To install a power distribution board is installed to record electricity consumption and distribute the load. To install a load break switch for the incoming line, with automatic circuit breakers for each outgoing line.
To install lightning protection for the designed equipment (solar collectors).
Total project funding (USD): 21,900
Source of financing:
Project site: Chenkovsky Bor recreation camp, urocgishche Chenki, Gomel District, Gomel Oblast
Contact person:
Igor Beizerov,
Head of the education, sport, and tourism department of the Gomel District Executive Committee
Phone: (0232) 53 78 35
Olga Pugacheva,
Director of the educational institution Chenkovsky Bor Recuperation Camp, Phone: (8044) 717 54 01