The reactor vessel was made by the Volgodonsk-based branch Atommash of the Russian company AEM Technologies. This piece of equipment weighs over 330 tonnes. It is 13 meters high, with the diameter as large as 4.5 meters. The reactor is a vertical cylinder with an elliptical bottom. The reactor core and the internal components will be located inside.
The manufacturer sent the product on its way on 14 October. Combined means of transportation were used to deliver the piece of equipment to the nuclear power plant. Heavy trucks transported it from the manufacturer to the Tsimlyansk water reservoir first. From there the vessel was shipped by river to Veliky Novgorod. A specialized transporter was then utilized to deliver the reactor vessel by rail to the construction site.
The manufacturing of the reactor vessel for the second power-generating unit continues. It is expected to arrive in Belarus in 2017. On the whole, AEM Technologies will make over 50 kinds of equipment for the Belarusian nuclear power plant. A total of over 4,000 tonnes of equipment will be made and shipped in 2013-2017.
The Belarusian nuclear power plant is a project to build an AES-2006 type nuclear power plant 18km away from Ostrovets, Grodno Oblast. The Belarusian nuclear power plant will have two power-generating units with the total output capacity of up to 2,400MW (2x1,200MW). In line with the general contract for building the nuclear power plant the first power-generating unit is scheduled for commissioning in 2018, with the second one to go online in 2020.