Official Website of the Republic of Belarus
Business
Belarus Events Calendar
Belarus’ Top Tourist Sites
UNESCO World Heritage Sites in Belarus
Belarusian sanatoria and health resorts
Souvenirs from Belarus
| Home | Business | Business news

Business news

4 Oct 2021

First unit of Belarusian nuclear power plant reconnected to power grid

First unit of Belarusian nuclear power plant reconnected to power grid

MINSK, 4 October (BelTA) – The first unit of the Belarusian nuclear power plant has been connected to the power grid, the press service of the Belarusian Energy Ministry told BelTA.

According to the source, the first unit of the Belarusian nuclear power plant was connected to the power grid at 18:20 on 4 October. The electrical output of the turbine generator is rising. At present it stands at 360MW.

The first unit of the Belarusian nuclear power plant was connected to the power grid in line with requirements of the standard operating procedure on safe operation without remarks, the Energy Ministry stressed.

Archive
Su Mo Tu We Th Fr Sa
Great Patriotic War monuments in Belarus